Work has begun on the 15th hole snack shack remodel project.  Tom Myers is doing the work, he will be rebuilding the roof and screened in portion of the building.  When he is finished, the building will be painted to provide a more professional appearance.  Our plan is to install stone veneer on the outside of the building sometime in the near future to resemble the appearance of the 1st tee water station.

Preparing to tear down the front of the building.  The new screened in area will have a taller ceiling, matching that if the inner room.

We will be cutting off a portion of the roof overhang to allow for fascia and soffit.
The color of the building will be more of a tan vs. the current green.
 
 
 
Last week we modified one of our spray rigs to water the seed that we planted along the cart paths.  This has been working great and has sped up the recovery process on the paths.